skip to main
|
skip to sidebar
Emily Forbes FMP
Electric Dialogue
Friday, May 15, 2009
I am working with a framer called Richard Dawes. We have been going through the design and intricate details over the past couple of weeks and began the production today and it will be finished tomorrow.
The studio
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
Blog Archive
▼
2009
(32)
►
June
(1)
▼
May
(22)
Synching the video to the music track.As I was fin...
I have now got some more footage to edit without t...
CD designs
Sudden change!To convey the concept of my film i w...
Here are a few screen grabs from the first edit of...
The past few days i have been filming the installa...
I can't believe it..its working...all the bulbs ar...
Working out the positioning of the cablesThis is p...
Adding the outlineStop frame paint from Emily Forb...
Meeting Peter Cohn - a chandelier expertI bought t...
Day 2 in the studio:Today we finished the building...
I am working with a framer called Richard Dawes. W...
Second filmFor the second part of this project I a...
SwitchesI have taken the switches and removed the ...
Stop frame testThis is a short animated test of so...
Music TrackI have also been working with a musicia...
Testing various substances for the outline of the ...
I have been experimenting with various ways to act...
Music TestI have been working with a musician to c...
The electrical wiring:I have now changed all the e...
Having had a meeting with the framer about the con...
Bulb Layout
►
April
(9)
No comments:
Post a Comment